CURRENT BIDS

  • Contract No. 1 – Drainage Improvements

    Client: Town of Pollocksville

    Project Engineer: Richard B. Moore P.E.

    Date & Time of Bid: March 13, 2025 at 2:00 PM

    Advertisement for Bids

    WORK under this CONTRACT includes, but is not specifically limited to, the construction and installation of approximately 580 linear feet of 24" diameter storm sewers, associated structures, appurtenances, demolition, clearing, and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.

  • 2024 ARPA Water Systems Improvements Contract No. 23 - Elevated Storage Tank Painting

    Client: Town of Greenevers

    Project Engineer: David E. Gurley III, P.E.

    Date & Time of Bid: April 1, 2025 at 2:00 PM

    Bid Tab

    REPAIRING, CLEANING, AND REPAINTING EXTERIOR OF EXISTING 75,000 GALLON STEEL ELEVATED STORAGE TANK.

    -     Cleaning shall be in accordance with SSPC-SP6/NACE 3 Commercial Blast Cleaning to remove existing coating and provide a 2.0 mil anchor profile.

    -     Inspection and remedying of any walkway drainage problems.

    -     Containment of paint removal debris.

    -     Application of paint system.

    -     Protect existing cables and antennas.

    -     Construction storage and cleanup.

    -     East Carolina Broadband equipment (antennas and cables) to be removed by ECB prior to cleaning and re-painting the tank.

  • Contract No. 1 – WWTP Improvements

    Client: Town of Macclesfield

    Project Engineer: Richard B. Moore P.E.

    Date & Time of Bid: April 8, 2025 at 2:00 PM

    Bid Tab

    WORK under this prime CONTRACT includes, but is not specifically limited to, general, plumbing, mechanical, and electrical construction of wastewater treatment plant improvements and associated equipment, piping, valves, fittings, controls, painting, appurtenances, clearing, demolition, grading, erosion control, landscaping, fencing, testing, and other WORK as shown on the PLANS or specified in the SPECIFICATIONS. A detailed summary of the proposed work is as follows:

    - A new influent/return sludge pump station, mechanical barscreen with manual bypass barscreen, manual grit removal structure, new oxidation ditch, new secondary clarifier, renovation of the existing secondary clarifier, new dual cell tertiary filter, yard piping, electrical work including standby power generator, chlorination-dechlorination building, new operations/lab building, and site work.

    - Demolition of the following items: existing manhole No. 200048, existing influent pump station, existing grit chamber, existing influent box, existing distribution box, existing manhole No. 1, existing electrical hut and standby generator, existing control building, and existing filters.

  • Contract No. 7 - Sanitary Sewer Improvements

    Client: Town of Ayden

    Project Engineer: Richard B. Moore P.E.

    Date & Time of Bid: April 17, 2025 at 2:00 PM

    Bid Tab

    WORK under this CONTRACT includes, but is not specifically limited to, the construction and installation of approximately 2,200 linear feet of 8" diameter sanitary sewer rehabilitation of the Town’s existing Sewer Pump Station No. 1, associated manholes, services, fittings, casings, drybores, appurtenances, demolition, clearing and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.

  • Contract No. 18 – Chlorination Conversion Improvements

    Client: Greene County

    Project Engineer: Richard B. Moore P.E.

    Date & Time of Bid: April 24, 2025 at 2:00 PM

    Re-Advertisement for Bids

    WORK under this CONTRACT includes, but is not specifically limited to, the construction and installation of seven (7) well renovation sites to convert disinfection from gas chlorine to sodium hypochlorite to include associated pumps, piping, valves, fittings, chemical feed systems, electrical system, controls, appurtenances, demolition, testing, painting, disinfection, and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.

  • Contract No. 13 – WWTP Improvements

    Client: Town of Littleton

    Project Engineer: Richard B Moore P.E.

    Date & Time of Bid: April 29, 2025 at 2:00 PM

    Re-Advertisement for Bids

    WORK under this prime CONTRACT includes, but is not specifically limited to, general, plumbing, mechanical, and electrical construction of wastewater treatment plant improvements and associated equipment, piping, valves, fittings, controls, painting, appurtenances, clearing, demolition, grading, erosion control, landscaping, fencing, testing, and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.

  • Contract No. 6 – Sanitary Sewer Rehabilitation

    Client: Town of Farmville

    Project Engineer: David F. Weir P.E.

    Date & Time of Bid: April 29, 2025 at 2:00 PM

    Re-Advertisement for Bids

    WORK under this CONTRACT includes, but is not specifically limited to, the construction and replacement of approximately 4,100 linear feet of sanitary sewer, approximately 1,050 linear feet of force main, one (1) sewage pumping station renovation, associated manholes, services, fittings, drybores, appurtenances, demolition, clearing and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.

  • Contract No. 6 – Sanitary Sewer Replacement

    Client: Town of Seaboard

    Project Engineer: Richard B. Moore, P.E.

    Date & Time of Bid: May 8, 2025 at 2:00 PM

    Re-Advertisement for Bids

    WORK under this CONTRACT includes, but is not specifically limited to, the construction and installation of approximately 4,000 linear feet of sanitary sewer in various sizes, associated manholes, services, fittings, appurtenances, demolition, clearing and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.

  • 2024 ARPA Water Systems Improvements Contract No. 22 - Well House Renovation

    Client: Town of Greenevers

    Project Engineer: David, E. Gurley III, P.E.

    Date & Time of Bid: May 8, 2025 at 2:00 PM

    Re-Advertisement for Bids

    DEMOLITION OF EXISTING WELL HOUSE to include, but not limited to:

    -     Break and remove existing pavement

    -     Remove designated building equipment and structures

    -     Demolish designated structures

    -     Remove foundation and slabs

    -     Remove underground tanks, piping, and other items encountered

    -     Disconnect and remove all existing electrical hardware

    -     Disconnect, cap, and remove all utilities to include storm drainage as shown on the PLANS provided utility or storm drain does not service adjacent facilities. Permanently mark the terminus of each

    -     Brace, support, and protect any attached or adjacent structures not to be demolished

    -     Remove dispose of material to a site provided by the CONTRACTOR

    -     Provide BORROW, backfill, and compaction typing to existing contous and crowning to establish positive drainage on site

    -     Dewatering

    -     Provide and place topsoil, fine grading, seed and mulch

    -     OTHER WORK as shown in the PLANS as specified herein for a complete and satisfactory demolition of designated structures

  • 2024 ARPA Water Systems Improvements Contract No. 24 - Well Control System

    Client: Town of Greenevers

    Project Engineer: David E. Gurley III, P.E.

    Date & Time of Bid: May 8, 2025 at 2:00 PM

    Re-Advertisement for Bids

    SCADA SYSTEM COMPUTER AND PERIPHERALS at Greenevers Town Hall in accordance with the PLANS and Section 13340 of the SPECIFICATIONS to include but not limited to:

    -     computer

    -     color monitor

    -     color laser printer

    -     computer operating system software

    -     SCADA HMI software

    -     integrated office suite software

    -     internet security and virus protection software

    -     uninterruptible power supply (UPS)

    -     SCADA system configuration and setup; graphic display screens; data collection, display, and storage; control setup; alarm annunciation; automatically generated reports

    -     install internet client and configure client on up to twelve (12) owner provided devices such as PCs, tablets, and smartphones regardless of manufacturer and operating system (iOS and Android)

    -     all other items and WORK as required for a complete and fully functional system as specified

  • Contract No. 30 – WWTP Improvements

    Client: Town of Seaboard

    Project Engineer: Richard B. Moore, P.E.

    Date & Time of Bid: May 8, 2025 at 2:00 PM

    Re-Advertisement for Bids

    WORK under this prime CONTRACT includes, but is not specifically limited to, general, plumbing, mechanical, and electrical construction of wastewater treatment plant improvements and associated equipment, piping, valves, fittings, controls, painting, appurtenances, clearing, demolition, grading, erosion control, landscaping, fencing, testing, and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.

  • Contract No. 7 – Sanitary Sewer Improvements

    Client: Town of Farmville

    Project Engineer: Richard B. Moore, P.E.

    Date & Time of Bid: May 8, 2025 at 9:30 AM

    Re-Advertisement for Bids

    WORK under this CONTRACT includes, but is not specifically limited to, the construction and installation/relocation of approximately 5,200 linear feet of 24" diameter sanitary sewer (part of Town’s Middle Swamp Sanitary Sewer Outfall) manholes, services, fittings, casings, drybores, appurtenances, demolition, clearing and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.

  • Contract No. 7 - Water Line Relocation

    Client: Greene County

    Project Engineer: Richard B. Moore P.E.

    Date & Time of Bid: May 15, 2025 at 2:00 PM

    Advertisement for Bids

    WORK under this CONTRACT includes, but is not specifically limited to, the construction and installation of approximately 2,750 linear feet of potable water lines between 6" - 8" diameter, associated valves, fittings, hydrants, services, casings, drybores, appurtenances, demolition, pipe abandonment, clearing, and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.