CURRENT BIDS

  • 2024 ARPA Water System Improvements. Contract No. 25 – Water Line Replacements

    Client: Town of Pikeville

    Project Engineer: David E. Gurley III, P.E.

    Date & Time of Bid: February 6, 2025 at 2:00 PM

    Bid Tab

    WORK under this PROJECT includes, but is not specifically limited to, construction of two (2) new booster pump stations, painting of an elevated storage tank, a booster pump control system, water line replacement, and an advanced metering infrastructure system.

  • 2024 ARPA Water System Improvements. Contract No. 26 – Booster Pump Stations No. 1 & 2

    Client: Town of Pikeville

    Project Engineer: David E. Gurley III, P.E.

    Date & Time of Bid: February 6, 2025 at 2:00 PM

    Bid Tab

    WORK under this PROJECT includes, but is not specifically limited to, the construction of two (2) new booster pump stations, painting of an elevated storage tank, a booster pump control system, water line replacements, and an advanced metering infrastructure system.

  • 2024 ARPA Water System Improvements. Contract No. 28 – Booster Pump Control

    Client: Town of Pikeville

    Project Engineer: David E. Gurley III, P.E.

    Date & Time of Bid: February 6, 2025 at 2:00 PM

    Re-Advertisement for Bids

    WORK under this PROJECT includes, but is not specifically limited to construction of two (2) new booster pump stations, painting of an elevated storage tank, a booster pump control system, water line replacements, and an advanced metering infrastructure system.

  • Speight School Road Sewer Hookup

    Client: Town of Saratoga

    Project Engineer: Richard B. Moore P.E.

    Date & Time of Bid: January 7, 2025 at 2:00 PM

    Bid Tab Sheet

    WORK under this CONTRACT includes, but is not specifically limited to, the construction and installation of sanitary sewer service connections to existing sewer collection lines located along Speight School Road to allow plumbing connections to identified homes with failing on-site septic systems and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.

  • Contract No. 18 – Chlorination Conversion Improvements

    Client: Greene County

    Project Engineer: Richard B. Moore P.E.

    Date & Time of Bid: March 18, 2025 at 2:00 PM

    Advertisement for Bids

    WORK under this CONTRACT includes, but is not specifically limited to, the construction and installation of seven (7) well renovation sites to convert disinfection from gas chlorine to sodium hypochlorite to include associated pumps, piping, valves, fittings, chemical feed systems, electrical system, controls, appurtenances, demolition, testing, painting, disinfection, and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.

  • Contract No. 1 – WWTP Improvements

    Client: Town of Macclesfield

    Project Engineer: Richard B. Moore P.E.

    Date & Time of Bid: March 18, 2025 at 2:00 PM

    Advertisement for Bids

    WORK under this prime CONTRACT includes, but is not specifically limited to, general, plumbing, mechanical, and electrical construction of wastewater treatment plant improvements and associated equipment, piping, valves, fittings, controls, painting, appurtenances, clearing, demolition, grading, erosion control, landscaping, fencing, testing, and other WORK as shown on the PLANS or specified in the SPECIFICATIONS. A detailed summary of the proposed work is as follows:

    - A new influent/return sludge pump station, mechanical barscreen with manual bypass barscreen, manual grit removal structure, new oxidation ditch, new secondary clarifier, renovation of the existing secondary clarifier, new dual cell tertiary filter, yard piping, electrical work including standby power generator, chlorination-dechlorination building, new operations/lab building, and site work.

    - Demolition of the following items: existing manhole No. 200048, existing influent pump station, existing grit chamber, existing influent box, existing distribution box, existing manhole No. 1, existing electrical hut and standby generator, existing control building, and existing filters.

  • Contract No. 7 - Sanitary Sewer Improvements

    Client: Town of Ayden

    Project Engineer: Richard B. Moore P.E.

    Date & Time of Bid: March 6, 2025 at 2:00 PM

    Advertisement for Bids

    WORK under this CONTRACT includes, but is not specifically limited to, the construction and installation of approximately 2,200 linear feet of 8" diameter sanitary sewer rehabilitation of the Town’s existing Sewer Pump Station No. 1, associated manholes, services, fittings, casings, drybores, appurtenances, demolition, clearing and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.

  • Contract No. 13 – WWTP Improvements

    Client: Town of Littleton

    Project Engineer: Richard B Moore P.E.

    Date & Time of Bid: March 20, 2025 at 2:00 PM

    Advertisement for Bids

    WORK under this prime CONTRACT includes, but is not specifically limited to, general, plumbing, mechanical, and electrical construction of wastewater treatment plant improvements and associated equipment, piping, valves, fittings, controls, painting, appurtenances, clearing, demolition, grading, erosion control, landscaping, fencing, testing, and other WORK as shown on the PLANS or specified in the SPECIFICATIONS.